Lowell High School

Sunrise Erectors, Inc. completed our scope of work on Phase II of the historic Lowell High School. Our part of the reconstruction and addition to the educational facility included:

    • Curtainwall & Storefronts
      • Preglazed CW on the New Freshman Building
      • Preglazed CW on the new enclosed pedestrian Bridges
      • EFCO Vent Windows
      • Glazed in ACM Panels
      • Interior Lightshelves
      • Horizontal Sunshades
      • Vertical Sunshades

Our scope of Phase II finished up in the late Summer of 2024. The crews went right back to work on Phase III which includes the restoration and reconstruction of the 1922 campus building. Team Sunrise is set to help install the New North Bridge, along with the new front entrance.