Our very own superheroes! Last week, on our Boston Children’s Hospital job site, 3 of our glaziers decided to go above and beyond in hopes of brightening a least.
All the posts of April 2019
Our very own superheroes! Last week, on our Boston Children’s Hospital job site, 3 of our glaziers decided to go above and beyond in hopes of brightening a least.
Progress update from the newest academic building up at Northeastern University’s Burlington campus. One of our current design-assist projects! Sunrise team was contracted to install the entire exterior facade system.
Team working on the Kingspan Optimo Panel install (Silversmith finish) over at the Acorda Therapeutics project in Chelsea. The scope of this project includes a penthouse level addition of existing.
Two of our 135-foot booms — “Isabella” and “Wilma” — assisting the crew out at the Boston Children’s Hospital Family Garage & Bridge project! (GC: Suffolk Construction / Architect: Payette Associates)
This week, we would like to recognize one of our glaziers, Jared MacDonald, for our “Sunrise Safety Spotlight.” Jared is currently working at the Cape Cod 5 Headquarters job site.
The team continues to progress on the ACM and corrugated architectural panels. The HVAC/MEP scope involved with the project required special consideration of equipment loading for each area of the.
Every month, since the first of the year, that we go without a recordable injury in our on-site fabrication plant, our safety manager, Dan Silverman, sets up a round of.