Sunrise Erectors
  • Home
  • About
    • Who We Are
    • Executive Team
    • Company Culture
    • Careers
  • Capabilities
    • Facade Systems
    • Fabrication Plant
    • Clients
  • Design-Assist
  • Portfolio
  • Recent News
  • Contact Us

July 2017

All the posts of July 2017

butc 7.27.17
28 July

Sunrise crew teams up with Bond and ELKUS Manfredi to make this challenging install look easy!! (BU Theater Center / Boston)

Recent News, July 28, 2017
pope francis 7.27
28 July

The new Pope Francis high school project is well underway out in Springfield! Scope includes a knightwall engineered system, oko skin fiber cement panels, corrugated metal panels, and ACM. (GC: Fontaine Bros., INC. / Architect: CBT)

Recent News, July 28, 2017
126 border 7.25.17
25 July

Progress shot of the corrugated metal panel install at the 126 Border Street project in East Boston. (GC: Cranshaw Construction / Architect: ICON Architecture, Inc.)

Recent News, July 25, 2017
BUTC 7.21.17
21 July

Oversized laminated IGUs, approx. 7’x15′, being offloaded at the site at BU Theater for the north elevation structural curtainwall. (GC: Bond Brothers, Inc. / Architect: Elkus-Manfredi Architects, LTD.)

Recent News, July 21, 2017
Photo Jul 18, 10 42 29 AM
19 July

Action shot of SEI crew installing the last 3-ply laminated glass fin over the portal entrances at the North Elevation of BU Theatre. The ease and success of the fin installation was made possible by the engineering and coordination teamwork between Bond Brothers, Elkus Manfredi Architects, and Sunrise Erectors throughout the planning and implementation process.

Recent News, July 19, 2017
Photo Jul 18, 11 12 24 AM (1)
19 July

Progress photo of the South Elevation of BU Theater. All materials shown were furnished and installed by SEI. Storefront windows, curtainwalls, window glazing, 3 types of corrugated metal panels in 6 color combinations installed in a predetermined “random pattern”, ACM storefront fins, ACM infill panels, ACM roof coping, and IPE wood rainscreens. (GC: Bond Brothers, Inc. / Arhitect: Elkus-Manfredi Architects, LTD.)

Recent News, July 19, 2017
BUTC 7.11.17
12 July

Our team hard at work installing 40′ sloped glass fins at the Boston University Theater Center. System designed and engineered by Sentech Architectural Systems. (GC: Bond Brothers, Inc. / Architect: Elkus-Manfredi Architects, LTD.)

Recent News, July 12, 2017
revere hotel 7.12.17
12 July

Installation of steel windows and glazing at the Revere Hotel in Boston Common. (GC: Cafco Construction Management, LLC / Architect: Cambridge Seven Associates)

Recent News, July 12, 2017

Recent Posts

  • Progress at UMass Boston
  • Vertical fins at So. Boston Waterfront
  • Checking in from 828 Winter St.
  • Great start at UMass Boston garage
  • Wrapping up at BU Theater Center

Archives

  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016

Categories

  • Recent News
  • Uncategorized

Featured Projects

  • clippership1
  • 399-binney1
  • king open1
  • 828-winter1
  • mount auburn1
  • so-boston-water1
Sunrise Erectors | 290 Pine St., Canton, MA 02021 | 781.828.8814
(c) 2015 Sunrise Erectors, All Rights Reserved
  • Home
  • About
    • Who We Are
    • Executive Team
    • Company Culture
    • Careers
  • Capabilities
    • Facade Systems
    • Fabrication Plant
    • Clients
  • Design-Assist
  • Portfolio
  • Recent News
  • Contact Us