Levolux aluminum fin install at Harvard DEF

IMG_2596small IMG_2597small IMG_2599small

Check out these great shots of our crew installing Levolux aluminum fins out in Allston at the Harvard University DEF site!

Each individual fin is lifted by a crane and carefully guided into place by two sets of workers, on two different boom lifts. They then fasten each fin to the steel. Each piece is roughly 20 feet long and there are a total of 530 fins on the building.

Cool stuff!

GC: BOND
Architect: Leers Weinzapfel Associates Architects, Inc.